Community Energy Malawi(CEM)

Project Description

  1. Construction of 7km 33kv line and 35km MV 400 volt lines and connecting 665 Households installation at Sitolo village.
  2.  Design of 33kv/400 volts lines , and preparing bill of quantities for both 33kv/400volts and Households at Ndawambe and Molosiyo respectively.
  3. Sitolo solar minigrid; Design and installation 80kw solar system in mchinji.
  4. Design and Installation of solar system 12.4kw Energy Hub in Balaka

Project Value

Not Available

Other Details

PROJECT GALLERY

Quotation Form

CHOOSE THE SERVICE